Safety Assesment

Tutum Consulting were appointed by Taylor Wimpey to examine and report on the safety implications of 430 dwelling development at Chelmer Waterside which sits on a peninsular between the River Chelmer and Blackwater Navigation Canal.

The appointment focused on considering the design of the public realm which adopted an innovative approach using a diverse palette of materials and engineering solutions. The report concluded with a range of recommendations as to how the physical layout could address possible future safety issues whilst ensuring all users could navigate the environment safely and efficiently.

transport statement

Northampton Bike Park

In August we were appointed by West Northamptonshire Council/Sport England on the preparation of a planning application for a free to use Mountain Bike Park.

The work incorporated a parking survey and access proposals together with liaison with the local Highways Authority to ensure the scope of the transport work.  Through this scoping exercise we were able to reduce the work required for the planning application and highways consideration, which in turn delivered significant costs savings to our client.

Skip to content